Joined
·
3,594 Posts
Saran wrap with a little masking tape to hold it in place...
The plywood to be installed after the flotation is installed. Plan to do every other opening (between ribs) then I can cut the foam even with the top of the deck supports then do the other openings.
I also plan to add cut to fit 2 x 6's on the ribs that don't get an aluminum support. the ribs just happen to be 1 1/2" wide so the 2 bys will fit nicely. Attached like the factory did the aluminum supports (have enough sheet aluminum). All ready got a hundred ss sheet metal screws, and have a couple hundred ss wood screws. think I might put a bead of 5200 between the rib and 2 by so there be no chance of any rattles.
Just finished making a jig for my table saw so I can cut the angles on the 2 bys to match the hull.
The plywood to be installed after the flotation is installed. Plan to do every other opening (between ribs) then I can cut the foam even with the top of the deck supports then do the other openings.
I also plan to add cut to fit 2 x 6's on the ribs that don't get an aluminum support. the ribs just happen to be 1 1/2" wide so the 2 bys will fit nicely. Attached like the factory did the aluminum supports (have enough sheet aluminum). All ready got a hundred ss sheet metal screws, and have a couple hundred ss wood screws. think I might put a bead of 5200 between the rib and 2 by so there be no chance of any rattles.
Just finished making a jig for my table saw so I can cut the angles on the 2 bys to match the hull.