Here is the beginning of my very slow conchfish 16 build. I got the plan a few weeks ago, cut out the forms, got some carbon core and ripped down two sheets into 2” strips. Slow because I have a ft job, a 6.5 year old and a wife that works 60+ hours a week, and a husk.
I’m giving myself a year. Hopefully less. Plan is raka epoxy, 25 Yamaha 4 stroke and to finish this. I bought four sheets of 3/4 and two 1/2” from Jesus in Tampa. I’m in clearwater. Great prices. Cut the carbon core down so it would fit in my wagon. Jesus is darn near the nicest guy.
I’m giving myself a year. Hopefully less. Plan is raka epoxy, 25 Yamaha 4 stroke and to finish this. I bought four sheets of 3/4 and two 1/2” from Jesus in Tampa. I’m in clearwater. Great prices. Cut the carbon core down so it would fit in my wagon. Jesus is darn near the nicest guy.
Attachments
-
1.3 MB Views: 469
-
1.6 MB Views: 436
-
1.4 MB Views: 379
-
1.1 MB Views: 406
-
699.1 KB Views: 360
-
1.5 MB Views: 364